300mwp photovoltaic power generation project with Jiangshanyongsheng at Yulin in Shanxi.

 

Shanxi Yulin Jiangshanyongsheng 300MW photovoltaic power generation project is located at the Maowusu desert in the northern of Shanxi province, bordering Ordos of Inner Mongolia, of which the construction period will be from October to December, 2016. The main workload of this project includes a conventional 110kV booster station,196 photovoltaic power generation units, 51347 sets of structures, 1224648 modules, and about 5,000 kilometers of cables. The project was the largest photovoltaic power generation project in China at that time. On December 25th, the total capacity of the project exceeded 300MWp.

      

 

 

 

 

200mwp fishery solar complementary power project with Dongda at Datong lake in Yiyang.

 

The 200MWp project of Hunan Yiyang Datonglake Dongda Photovoltaic Power Generation Co., Ltd. is located in Datong Lake District, Yiyang City, with the total planned capacity of 200MWp, the first-phase capacity is 100MWP and the second-phase capacity is 200MWp. The 200MWP project covers an area of about 3,600 mu and was successfully connected to the grid on June 28th, 2017.

 

 

 

 

 

 

 

 

 

 

 

 

100mwp photovoltaic generation power project at Mulei park in Kaisheng, Xinjiang.

 

Xinjiang Kaisheng Mulei Park 100MWp Photovoltaic project is located in Xinjiang Mulei Kazak Autonomous County which is the temperate desert region of northern Xinjiang. This project has an installed capacity of 100.0032MWp and adopts the scheme of block power generation and concentrated interconnection. In this period, there are a total of 40 power generation units, 339,724 photovoltaic modules, 60 centralized inverters, 315 group-series inverters, and 40 transformer tanks, which includes six kinds of mouting structures and seven types of modules with a wide variety of materials. On May 20th, 2019, the construction of piles foundation began; On June 2th, 2019, the installation of brackets began; On June 10th, 2019, the installation of modules began; On June 25th, 2019, full capacity installation completed; On June 26th, 2019, the project passed both the pre-grid quality inspection of The Quality supervision Center station of Xinjiang Electric Power Construction Project and the pre-grid acceptance of the Power Science Research Institute of State Grid Xinjiang Electric Power Co., LTD.

 

 

    

 

 

 

 300mwp photovoltaic generation power project at Yuchuan in Neiqiu.

 

Hebei Yuchuan New Energy Technology Co., LTD's 300MWP photovoltaic project is located at Neiqiu in Xingtai, Hebei province, the foot of Taihang mountain, hilly terrain, where the topography is complex and volatile. Total planning area of the project is about 15000 mu, involving nearly 30 villages, more than 20 kilometers across, and collecting circuit about 150 kms. The installation capacity of the power station is 400 megawatts, and it is planned to construct a 220 kV booster station located at Guojiagou Village, Nanai Township, Neiqiu County. A new 220 KV transmission line will be connected to longquan 220 KV substation in Xingtai County, with a total length of about 26 kilometers. The project officially started work on March 27th and is expected to be connected to the grid by June 30th.

           300mwp photovoltaic generation power  project  at Yuchuan in Neiqiu.